Ending of an assembly work

Ending of an assembly work

2014-01-14

        Grimex ended successfully the  manufacturing and assembly of the T345 distribution conveyor from Jilt North quarry. This accomplishment is the biggest mechanical investment of CEO at the beginning of the year 2014.

        Its main characteristics are:

  • Outfit with a 2000 mm width conveyer belt;
  • 167 m long;
  • fitted for coal and sterile transportation;
  • Drive power supply: 1x630 KW;
  • Conveyor speed -6 m/s;
  • Total power supply - 690kw.